Skip to the content
  • Short-term restrictions
    • 01.05.2026 | Puschkinallee (full closure)

      On May 1, 2026, a large number of events subject to assembly law will take place in the Plänterwald / Treptower Park area. For this reason, Puschkinallee will be closed from 11:00 a.m. to 10:00 p.m.

      Please allow extra time to reach Hafen Treptow. We recommend using the S-Bahn for your journey (S-Bahn station Treptower Park).

de

Waste disposal vessel MS Elsa

Year of construction: 1936 as a cargo ship

1976: Conversion to a sewage disposal ship

2001/2002: Installation of crane system

Winter 2003: extensive shipyard work, new construction of the complete tank and suction system – capacity 50 m3, new reversing gear, new deck superstructure

Length: 34.54 m
Width: 5.31 m
Area of ​​operation: Zone 4, Berlin waterways
Engine: Deutz BF 4M 1013 MC / 89 kW
Reversing gear: Twindisc MG 5050C

Crane system: 10m radius, lifting capacity at max. 10m radius 950 kg

Tank system: 3 cylindrical evacuable tanks with a total of 50 m3 capacity, 1 vacuum pump 18 kW

Range of services: “Faecal disposal” own fleet and third parties, crane services and transport services for assembly work etc.

Label
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.